Design of Key Technologies for 3��130 t/h Boiler Magnesia FGD in Some Power Plant
DU Chun-xia~1,SHI Yu-quan~2,WANG Min~1(1.China Shipbuilding Industry Corporation Tianjin 707 Hi-Tech Co.,Ltd.,Tianjin 300409,China; 2.Department of Chemistry,School of Science,Tianjin University,Tianjin 300072,China)
(1.China Shipbuilding Industry Corporation Tianjin 707 Hi-Tech Co.,Ltd.,Tianjin 300409,China; 2.Department of Chemistry,School of Science,Tianjin University,Tianjin 300072,China

Abstract
Reference
Related Articles
Download: PDF (332KB)   HTML 1KB   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The basic design parameters and the main economical technical specification of 3��130 t/h boiler flue gas desulphurization(FGD) were proposed and the craft system composition and technical process of wet FGD(MgO) were introduced.The main equipment lectotype and standard were explained emphatically.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
Keywords��   
Received 2009-03-15; published 2009-03-15
Cite this article:   
DU Chun-xia~1,SHI Yu-quan~2,WANG Min~1.Design of Key Technologies for 3��130 t/h Boiler Magnesia FGD in Some Power Plant[J]  Chemcial Industry and Engineering, 2009,V26(2): 161-164
Copyright 2010 by Chemcial Industry and Engineering